Road Construction
The existing bridge is situated in a sag vertical curve between reversing horizontal "S" curves on both approaches.



high bridge looking north east_thumb.jpg
Looking North


high bridge south looking_thumb.jpg
Looking South


A new alignment about 1/3 mile on each side of the new bridge is being constructed to create a 35-mph alignment which is consistent with the rest of the road.

IMG_1114_720x540.jpg
Earthwork nearing completion on new road alignment


IMG_1590_720x540.jpg
Earthwork completed. Bridge beam coming on site