The second segment is on Big Creek Road, CR 423, and starts approximately 3.7 miles east of the Big Creek Road/Bucks Lake Road intersection at Buck's Lake. This section consists of pavement rehabilitation. The rehabilitation will consist of 4" of new hot asphalt concrete pavement being placed over the existing pavement surface.
Some sub-excavation may occur to remove unsuitable material within the roadway prism. Geotextile will be placed at the bottom of the sub-excavation and then sub-excavation will be filled with select borrow material and re-compacted.
The length of this rehabilitation will be approximately 2.8 miles long.